May 06, 2023
Muffler
- (3.5 hours)
Category: Engine
Machined a hanger block from HDPE, tapped end of block for 1/4-20 bolt, cross drilled to mount to fuselage at unuesed landing gear bracket. Purchased rubber isolater, and used left over light mounting bracket at the cabane.